Softee

A complete feature set, at a fair price.

From €29
/ month on a commitment
From €39
/ month with no commitment
Term
12, 24, 36 months or none
Set-up from €210
one-off
See the plans

Plans built for every size of
public-sector estate

From a rural parish to a town of several thousand residents, pricing follows one variable: the number of metering points to connect. With or without a commitment, your choice.

Softee platform
Demo
Energy cost · 12 months
€184,200
Sites monitored
14
CO₂ · 12 months
312 t

Example data

Work out your monthly figure

Pricing follows the number of metering points (delivery points) to connect. With or without a commitment, your choice.

pts
pts
From
29/ month excl. VAT
Metering points29 €
Sub-metering
Options
+ set-up (one-off)
Included in your plan
    Get this quote by email
    ✓ Your email client opens with the request already written. Nothing is sent until you send it.

    Indicative prices excluding VAT, options quoted separately. Non-binding estimate: a precise quote will follow.

    Frequently asked questions about pricing

    A metering point is a meter carrying a delivery-point reference, attached to a site. Pricing follows that count — not the number of buildings and not the number of users: a town hall with a single meter stays in the first band even if twenty staff log in.
    Going below the main meter: a calculated flow defined by formula lets you monitor one end use, one floor or one room separately, and a percentage allocation key lets you share a meter between several sites. It is an option, priced by band of points.
    €29 excl. VAT per month for 1 to 10 metering points on a commitment, €39 excl. VAT per month without one, plus a one-off set-up fee from €210. Above 100 metering points, pricing is quoted individually.
    Yes, once. It starts at €210 in the first band and rises with the number of points to connect. The calculator shows it for your configuration.
    No. You can subscribe over 12, 24 or 36 months, or with no commitment. The no-commitment price is higher; the calculator shows both.
    It is a monthly option. It covers preparing the consumption figures you have to declare — weather correction, reference year, kWh/m² per site, exports by building and period. The filing itself remains yours to submit on ADEME’s OPERAT platform.

    Beyond the plans, what you need comes
    first

    Something specific in mind? Let’s talk about it.

    Contact the Softee team